Papua New Guinea’s state power company, PNG Power Ltd (PPL), lost an estimated 472 million kina in 2024 due to fraud, power theft, and internal controls failures, according to a recent forensic investigation. The three-month probe uncovered systematic revenue leakages, including 220 million kina lost to power theft and meter bypassing, 152 million kina missing...

Unlock this article with Premium. To access all premium content, contact us at [email protected]
Already a member? Log in here